top of page

Paveking Construction 

Home: Welcome
Home: About

About Us

Since breaking into the industry in 2005, Paveking Construction cc has been recognized as a dependable contractor. We’ve provided clients with a wide range of services for all their needs. Whatever you have in mind, our professionals work to bring your dreams to life. Contact us to receive a free estimate today.

Our Services

Paveking Construction cc is ready to fulfill your contracting needs. Whether you’re looking for a few helpful tips or need an experienced professional to fully manage a project — we’ve got the tools and experience to guarantee success. Browse through our services below, and get in touch for an estimate today.

WhatsApp Image 2019-03-27 at 14.42.31.jp

Asphalt Mill & Replace

The mill and replace method is similar to the full depth remove and replace method. However, not all the existing asphalt has to be removed, which stretches your  Rand.

Milling asphalt is done by a machine that planes the pavement to a depth appropriate for the  repair. The section is generally ground down to a depth of up to 100mm. After milling is complete, the old material is then removed and disposed of. A tack coat is applied to the surface for adhesion between the layers of asphalt. New asphalt  is then installed to bring the failed area back up to the existing grade level. The new asphalt is then rolled to ensure compaction.

20180616_123431.jpg

Asphalt Surfacing

Step 1: Demolition and Removal

The first step in the asphalt installation process is to remove the existing surface, whether it is asphalt, concrete or pavers. 

  • Demolition and removal is completed using heavy machinery, including small bobcats and TLBs.

  • Debris is removed and transported off site.

  •  

Step 2: Drainage

​

Step 3: Prepare the Sub Base

The most important part of your new asphalt surface is actually the sub-base.

  • The sub-base provides a stable surface to support new pavement.

  • During the installation, base thickness, base stability, and compaction are important steps. If the sub-base is not appropriately compacted, the asphalt surface on top will not provide years of durability. 

​

 Step 4: Binder and Surface Course  

Once the sub base is laid and any soft areas are identified and repaired, it is time to add the binder.

  • The binder layer otherwise known as Priming consists of spraying a primer onto the compacted gravel or crushed rock base. This is carried out to prepare the surface for the subsequent seal coat and to assist in waterproofing the pavement.

  • ​

Step 6: Install New Asphalt Surface

Once the supportive structures of a new asphalt surface are installed, the top layer of fresh asphalt is added to provide a clean, smooth ride.

  • Surface asphalt is made up of small aggregate, sand and emulsion.

  • This combination of materials creates asphalt that when installed appropriately, provides a smooth and shiny finished surface. 

  • ​

Step 7: Butt Joints and Transitions 

It is very rare to install an asphalt surface that does not connect to existing driveways, roadways or parking lots. As such, we must ensure a smooth the transition from old surface to new.

  • Butt joints are areas were old asphalt or concrete meets new asphalt pavement.

  • These transitional areas require special attention to ensure that the grading and water run-off is appropriate.

​

To Complete the Project: Final Roll

Once the asphalt and butt joints have been laid, the entire surface is smoothed and compacted.

  • Using a steel roller, the new asphalt pavement surface is compacted and smoothed.

  • This process step ensures that no small bumps of aggregate or stone are left exposed.. 

WhatsApp Image 2019-01-21 at 20.00_edited.jpg

Sealcoating

A slurry seal is the application of a mixture of water, asphalt emulsion, aggregate (very small crushed and additives to an existing asphalt pavement surface. A slurry seal is similar to a fog spray except the slurry seal has aggregates as part of the mixture. Chip Seals are the most versatile and widely used pavement preservation process. These cost effective processes allow for large areas to be treated in an era of shrinking budgets. 

Double Chip Seals are suited for roads which exhibit moderate to severe cracking, open textured roads where surface

fines have been lost and on freshly leveled or scratched roads where the surface is too open and porous for a Single Chip Seal to be successful.

Double Chip Seal is a two layer Chip Seal where one is applied immediately after the other. The second application can utilize either ¼ inch or #8 aggregate, depending on the desired finished surface.

​

BENEFITS OF DOUBLE  SEAL

  • Doubles the protection from oxidation and deterioration from moisture

  • Can be successfully used on moderate to severely deteriorated and cracked roads

  • Extremely durable and flexible surface which reduces and significantly delays cracking

  • Improves skid resistance and winter traction due to the textured surface

  • Reduces snowplow damage

WhatsApp Image 2019-02-14 at 13.39.27.jp

Segmented Paving, Kerbing & Channeling

Segmented concrete paving is a system of individual, shaped blocks, arranged to form a continuous, hard-wearing surface overlay. Kerb & Channel is a concrete or stone structure typically located at the edge of a road designed to provide road drainage and as a barrier to prevent vehicles from leaving the roadway.

BP Meadowlands - 15.jpg

Earthworks

The Process of earthworks is to excavate the existing land to a suitable level so that road construction may begin. The earthworks can take the form of either excavation in the form of cuts or the construction of embankments to carry an elevated highway.

Home: Services

Projects

At Paveking Construction cc, we help individuals and businesses with our top of the line contracting services. Since starting out, we’ve taken on a variety of projects, always providing personalized attention to ensure precision and satisfaction with all of our work. Take a look at our recent projects and get in touch today to start your own.

Construction of Roads and Stormwater Systems in Mabopane Block U

DRD32D2/03/2016

Brakpan Plaza Rooftop Parking Lot

Complete

Get in Touch

This project involves a lot of compliance measures to make sure we follow industry standards adequately as it is a provincial road linking the North West Province with Gauteng. Want to learn more about similar projects? Get in touch today.

Get in Touch

If you’re looking for a certified contractor to manage a really complex job, consider this project a testament to our abilities. We managed to deliver excellent results on schedule and under budget. We worked closely with the client to understand their needs and preferences, and the successful outcome speaks for itself.

Get in Touch
Home: Projects

Contact

Unit 2 Apollo Square, 35 Nuwejaarsvoel Avenue, Chloorkop Kempton Park, 1619, South Africa

010 444 0120

WhatsApp Image 2019-02-14 at 13.39.11 (1
Back to Top
Home: Contact
bottom of page